Today's list of remaining items.
Cut shifter hole back, install boot.
Cut battery box ac support for hot side.
Tighten compressor housing, final.
Change adapter plate bolts.
Jack up and weld rear mounts to frame.
Cut and mitre hot side pipe, easy.
Fab cold side pipe.
Brake lines master to ABS mod.
Weld res for power steering.
Have line made for power steering.
Shorten rear drive shaft.
Lengthen front drive shaft.
Heater core lines.
Lower radiator line finish adapter.
Upper radiator line support used factory.
New belts.
Pulley bolts for water pump.
Patch hole In firewall.
Make 1.5" cab mount lift blocks.
Install air filter.
Turbo drain hose and clamps too short.
Wiring harness bullshit for sensors.
Check timing, set to 20°
Increase fuel at rack.
Turn star wheel.
Order 4 electric fans.
Fab radiator shroud for fans.
Wire in fans and controllers.
As you can see, it's a lot of stuff.